For Feb I said
UFO RR Done
Finish the Bear Afghan Done
Get an ornament done I did 3
Get a SOLAK square done Done although it was the one I started in Jan
Finish as many other things as poss I had 7 finishes in total
Finish the Bear Afghan Done
Get an ornament done I did 3
Get a SOLAK square done Done although it was the one I started in Jan
Finish as many other things as poss I had 7 finishes in total
For March I'd like to
UFO RR
Get an ornament done
Get a SOLAK square done
Make good progress on a WIP
I had a fairly good month with 84 hours 46 minutes of stitching time, 4 new starts and 7 finishes of those 4 were the new starts and 2 were really old UFO's
I did fall down when it came to finishing off some of my beading PHD's but I decided to concentrate on finishing stitching off for the olympics on the Wagon and I will get some of them done this month
3 comments:
Do you have a stop watch or a log book. I would not even dare to time how long I stitch coz that may create a problem or two. lol Not for me but you know the housework doesn't go away, hummmm, something like the piles of UFO's. Good luck with your March goals.
Be always in stitches.
WOW, you had some awesome time stitching. I was wondering the same thing too, how do you keep up with it? I might not want to try that though...wouldn't want to feel guilty about the amount of time:).
LOL, I stopped timing cause I felt guilty of all the stitching time and the lack of housework time :D Awesome on your goals being met! Well done :D
Post a Comment